Board of Assessment appeal review fee
|
$100
|
Chapter 5.1 AMUSEMENT DEVICES
| |
1. One to three machines
|
$50
|
2. Four or more machines (per machine above the first three)
|
$50
|
Chapter 5.2 SPECIAL AMUSEMENT PERMITS
| |
Special amusement permits
|
$20
|
Chapter 5.3 FOOD SERVICE ESTABLISHMENTS
| |
1. Victualers, innkeepers and lodging house initial fee
|
$50
|
2. Renewal fee
|
$25
|
Chapter 5.5 MASSAGE ESTABLISHMENTS
| |
1. Therapeutic massage establishment
|
$50
|
2. Therapeutic massager
|
$10
|
Chapter 5.6 MOBILE FOOD-VENDING UNITS
| |
Lunch wagon, mobile unit, or roving diner
|
$50
|
Chapter 5.8 TAXICABS
| |
1. Taxicab business license
|
$100
|
2. Taxicab vehicle license
|
$10
|
3. Taxicab operator license
|
$10
|
4. Closing out of business sales
|
$100
|
Chapter 5.10 USE OF THE PUBLIC WAY
| |
Initial permit application
|
$25
|
Renewal permit application
|
$10
|
Chapter 5.11 MARIJUANA BUSINESSES
[Added 8-9-2021 by Ord. No. 21-05] | |
Marijuana Retail Store - Preapplication fee
|
$750
|
Marijuana Retail Store - License fee
|
$6,000
|
Marijuana Cultivation Facility
| |
Tier 1
|
$750
|
Tier 2
|
$1,500
|
Tier 3
|
$2,000
|
Tier 4
|
$3,000
|
Marijuana Manufacturing Facility
|
$3,000
|
Marijuana Testing Facility
|
$3,000
|
Medical Marijuana Caregiver Home Establishment
|
$100
|
Transfer of license - other than Marijuana Retail Stores
|
$750
|
Chapter 5.12 SHORT-TERM RENTAL
[Amended 1-25-2022] | |
Owner-occupied (up to 2 licenses)
|
$100 annually
|
Seasonal dwelling
|
$100 annually
|
Non-owner-occupied
|
$750 annually
|
Increased occupancy limit application
|
$100 one time
|
Chapter 8.1 SOLID WASTE COLLECTION and DISPOSAL, Article II. Requirements, Resource Recovery Facility Disposal Fee Schedule.
| |
8.2.2.1 Resource Recovery
| |
As shown in Attachment 1.
| |
Article III. Deposit Permit
| |
Replacement sticker permit
|
$10, except there will be no charge if the applicant submits
sufficient remnants of the old sticker, or proof that the loss was
not due to the applicant's negligence.
|
Article IV. Commercial Disposal Service
| |
Hauler license fee
|
Class
|
Description
|
Fee
|
---|---|---|
A.
|
Any size, any materials, tipping outside, and with no cost to,
the Town.
|
$200
|
B.
|
Household waste and recyclables, large, tipping at the collection
facility. For haulers providing service to more than 25 residents
or businesses.
|
$100
|
C.
|
Household waste and recyclables, small, tipping at the collection
facility. For haulers providing service to 25 or fewer residents or
businesses.
|
$50
|
D.
|
Landfill, reuse, and recoverable materials. For haulers providing
service to residents or businesses delivering to the recovery facility,
and paying user fees.
|
$50
|
E.
|
Solid waste facility combination, large. For haulers providing
all disposal services to more than 25 residents or businesses.
|
$125
|
F.
|
Solid waste facility combination, small. For haulers providing
all disposal services to 25 or fewer residents or businesses.
|
$75
|
G.
|
Business-generated bulk salable paper goods. For baling facility
direct drop, any size.
|
Free
|
Chapter 8.4 BLASTING
| |
Level 1 blasting permit
|
$100
|
Level 2 blasting permit
|
$200
|
Chapter 10.3 STOPPING, STANDING and PARKING
| |
10.3.11 Towing
| |
Between 7:00 a.m. and 5:00 p.m., Monday through Friday
|
$85
|
All other times
|
$100
|
Additional charge if "dolly" has to be used
|
$15
|
Maximum charge for any dry run where a vehicle is not towed
|
$40
|
Motorcycle, extra charge
|
$15
|
First 24 hours of storage (unless towed due to snow removal)
|
$0
|
Charge if vehicle has to be unlocked
|
$0
|
Charge if transmission has to be unlocked from underneath the
vehicle
|
$0
|
Additional charge for any unusual circumstances
|
$15
|
Chapter 12.1 EXCAVATIONS, Excavation Permit Fees (per square yard)
| ||
---|---|---|
Surface Condition
|
First 25 square yards
|
Over 25 square yards
|
Asphalt pavement
|
$10
|
$8
|
Portland concrete
|
$12
|
$10
|
Gravel
|
$1
|
$0.80
|
Lawn grass
|
$3
|
$2.75
|
Field grass slopes
|
$1
|
$0.80
|
Unimproved areas
|
$0.50
|
$0.35
|
Chapter 12.4 SEAPOINT AND CRESCENT BEACHES, Beach Fire Permits
[Added 3-28-2022] | ||
Kittery property owner
|
$0
| |
Non-Kittery property owner
|
$15
| |
Chapter 12.6 SHELLFISH, Shellfish License Fees
[Amended 6-13-2022] | ||
Resident recreational
|
$15
| |
Residents 70 and over (limited to 15 licenses)
|
Free
| |
Residents under 14 years of age
|
$0
| |
Nonresident recreational
|
$30
|
Chapter 12.5, FORT FOSTER, Fort Foster Fees
| |
Season Pass
|
Fee
|
Resident
|
$20
|
Nonresident
|
$75
|
Senior resident
|
$5
|
Duplicate/Replacement Pass
|
Fee
|
Resident
|
$5
|
Nonresident
|
$15
|
Senior resident
|
$5
|
Single-Day Pass
|
Fee
|
Vehicle with occupants
|
$20
|
Walk/bike
| |
Adult
|
$5
|
Child
|
$1
|
Buses and Recreational Vehicles
|
Fee
|
School/summer camp bus (does not include additional vehicles
accompanying bus)
|
$75
|
Tour
|
$100
|
Recreational vehicle (Fees include entrance fee for occupants)
|
$50
|
Small Pavilion Rental
|
Fee
|
Up to 35 people (Fee does not include entrance fees or credit/debit
card processing fees)
|
$100
|
Large Pavilion Rental
|
Fee
|
Up to 50 people
|
$200
|
51 to 100 people (Fees do not include entrance fees or credit/debit
card processing fees)
|
$300
|
Chapter 13.1 SEWER SERVICE SYSTEM
| |
Article I. In General
| |
Rates and charges: Quarterly Usage and Capital Charge
| |
1. First 1,000 cubic feet or fraction thereof
|
$100
|
2. Per 100 cubic feet in excess of 1,000 feet
|
$7.46
|
Article III. Building Sewers and Connections
| |
Building sewer permit fees:
| |
1. Residential or commercial
|
$15
|
2. Industrial
|
$15
|
Article V. Private Sewage Disposal
| |
Private sewage disposal system permit and inspection fee
|
$10
|
Private sewage treatment facility after-hours labor charge (three-hour
minimum labor charge)
|
$25 per hour
|
Septic tank contents discharge rate
|
$0.10 per gallon
|
Holding tank contents discharge rate
|
$0.015 per gallon
|
Article VI. New Sewer Service Connection Fees
| |
Sewer Impact Fee (per unit charge)
|
$3,000
|
Sewer impact fees payable by the property owner must be paid prior to the connection of any sewer line to the municipal sewage collection system; or upon the issuance of any plumbing permit for additional plumbing fixtures; or change in use of any property already connected to the municipal sewage collection system. (See § 13.1.6.5.)
| |
Special Sewer Entrance Connection Fee
|
$3,000
|
This fee is established on a per-dwelling-unit basis for residences and on a per-unit-of-occupancy basis for nonresidential structures for each new entrance connection to a system main. (See § 13.1.6.6.)
| |
Chapter 13.3 PUBLIC SAFETY IMPACT FEE
| |
Public safety impact fee
|
$5/$1,000
|
Chapter 16.5 BUILDING/REGULATED ACTIVITY PERMITS
|
16.5.3 Application.
|
16.5.3.3 Fee.
|
Building/Regulated Activity
|
Fee
| |
---|---|---|
Per application
|
$25 base fee plus $12/$1,000 of value of work
| |
Commercial/industrial and larger than two-family dwellings
|
$100 base fee plus $15/$1,000 value of work
| |
Reinspection for a failed inspection
|
$50
| |
Structure demolition
|
$20
| |
Stop work order removal
|
$125
| |
Building permit amendments (Value of Change)*
|
$12 or $15/$1,000
| |
After the fact building permits
|
Double fee
| |
For maintenance activities to existing residential property
including, but not limited to, repairs to roof, siding, painting,
chimney, etc., the Town will waive the $12/$1,000 fee up to the first
$10,000 of the cost of the project. An application is required to
be filed for work under the waiver at the $25 application fee.
| ||
*Note: does not apply on maintenance projects and/or permits
remaining under an initial $10,000 value of work.
| ||
EXAMPLES:
| ||
Building/regulated activity permit fee for a new $148,000 house:
| ||
Base application fee: $25 plus ($148,000/$1,000) x $12 = $1,801
| ||
Total building/regulated activity permit fee: $1,801
| ||
Maintenance Permit Example #1: Roofing repairs = $15,000.
| ||
Base application fee = $25 plus ($15,000 - $10,000) $5,000 cost
or 5 x 12 = $60 for a total cost of $85.
| ||
Maintenance Permit Example #2: Chimney repairs = $10,750.
| ||
Base application fee = $25 only and fee is pro-rated on $750
($9) for a total of $34 (fee is pro-rated on any $1,000 over the waiver
amount).
| ||
Note 1: The value of work is based on the fair
market value of the improvements as determined by the Code Enforcement
Officer. Any work costing over a $10,000 is pro-rated to the even
$100 of cost for permitting purposes.
| ||
Note 2: Building/regulated activity permit fees
do not include fees for the following:
| ||
•
|
Internal plumbing inspection (per fixture fee)
| |
•
|
External plumbing inspection (per septic system fee)
| |
•
|
Town electrical inspection ($25 per inspection)
| |
•
|
State electrical inspection (per fixture fee)
| |
•
|
Sewer impact fees ($2,000 per unit)
| |
•
|
Public safety impact fee
| |
•
|
Development exaction fee
| |
16.5.8 Plumbing and Septic System Permit Fees.
| ||
16.5.8.2 Plumbing Permit Fees.
| ||
Administrative fee for all permits:
|
$25 plus
| |
Minimum fixture fee
|
$40
| |
Fixture fee
|
$10 per fixture
| |
Reinspection fee
|
$20
| |
New water distribution and/or drainage pipes installation or
relocation, but no fixtures installed
|
$24
| |
Hook-up fee for connection of a mobile home which bears the
Housing and Urban Development (HUD) seal or a modular home which bears
the Manufactured Housing Board seal to a building sewer
|
$24
| |
Hook-up fee for connection to a public sewer when piping is
installed beyond the jurisdiction of the sanitary district
|
$24
| |
Permit transfer fee
|
$10
| |
16.5.8.3 Subsurface Wastewater Disposal System Fees.
| ||
State surcharge
|
$15
| |
Complete systems:
| ||
Administrative fee for all permits
|
$50 plus
| |
Engineered system
|
$200
| |
Non-engineered system
|
$250
| |
Primitive system (includes one alternative toilet)
|
$100
| |
Separate grey waste disposal field
|
$35
| |
Seasonal conversion permit
|
$50
| |
First time system variance
|
$20
| |
System components (installed separately):
| ||
Alternative toilet (only)
|
$50
| |
Disposal field (engineered system)
|
$150
| |
Disposal field (non-engineered system only)
|
$150
| |
Treatment tank (non-engineered system)
|
$150
| |
Treatment tank (engineered system)
|
$80
| |
Holding tank
|
$100
| |
Other components (complete pump station, piping, other)
|
$30
| |
Chapter 16.6 MUNICIPAL ACTION DECISION APPEAL, VARIANCE AND OTHER REQUESTS
| ||
16.6.5.13 Fees.
| ||
Board of Appeals Application Fees
| ||
Administrative Decision Appeal Request
|
$50
| |
Variance Request
|
$100
| |
Miscellaneous Variation Request
|
$100
| |
Special Exception Use Request
|
$150
| |
Chapter 16.8 DESIGN and PERFORMANCE STANDARDS - BUILT ENVIRONMENT
| ||
Article X. Signs, 16.8.10.11 Sign Permit Application Procedures.
| ||
Sign permit fee per sign
|
$100
| |
Replacement decals
|
$25
| |
Temporary sign
|
$25
| |
Annual permit fee, signboards and/or products, Kittery Foreside
|
$25 for the full year or portion thereof
| |
Article XIX. Sprinkler Systems, 16.8.19.4 Fees and Fines.
| ||
Sprinkler system permit fee
|
$100
| |
Chapter 16.9 DESIGN and PERFORMANCE STANDARDS - NATURAL ENVIRONMENT
| ||
Article III. Conservation of Wetlands Including Vernal
Pools, 16.9.3.6 Procedures for the Wetlands Alteration Application.
[Amended 3-28-2022] | ||
For altered or filled wetland area
|
$10 per square foot
| |
Article VI. Overboard Discharge Systems, 16.9.6.3.1 Application
for Permit — Fee.
| ||
Application fee
|
$100
| |
Issuance fee
|
$50
| |
Article VIII. Floodplain Management, 16.9.8.6 Application Fee and Expert's Fee.
| ||
Flood hazard development permit application fee valuation of
the development
|
$1 per $1,000
| |
16.10.5.1.7 Submission Contents Complete. Planning Board
Application Fees
| ||
Subdivision plans:
| ||
Subdivision Sketch Plan Review
|
$200
| |
Subdivision Plan Review
|
$500 plus $50/lot or dwelling unit
| |
Modification to an approved subdivision plan
|
$300 flat fee
| |
Site Plans:
| ||
Site Sketch Plan Review
|
$200
| |
Site Plan Review
|
$300 plus the greater of: $50/use or unit; $5/100 square feet
of gross floor area; $0.50/linear foot of dock, slip and float; or
$20/unit intended to provide overnight sleeping accommodations
| |
Major Modification to an approved site plan
|
$300 plus the greater of: $50/additional use or unit; $5/additional
100 square feet of gross floor area; $0.50/linear foot of additional
dock, slip and float; or $20/additional unit intended to provide overnight
sleeping accommodations
| |
Minor modification to an approved site plan
|
$100
| |
Any plan located in the Shoreland Overlay Zone:
| ||
Shoreland Overlay Zone plan review
|
$200
| |
Other Applications:
| ||
Private right-of-way plan review
|
$300
| |
New commercial or business use change
|
$100
| |
Wireless communication services facility plan review
|
$1,500
| |
Wireless communication services facility co-location plan review
|
$1,000
| |
Accessory dwelling unit plan review
|
$100
| |
Zone or Code text change
|
$300
| |
Note 1: Where an application fits more than one
category, the higher application fee applies.
| ||
Note 2: For the purposes of this fee schedule,
the term "gross floor area" means the total area of a building measured
by taking the outside dimensions of the building(s) at each floor
level intended for occupancy or storage. "Docks" are measured beginning
from the mean low-water mark.
| ||
Chapter 16.12.3 AFFORDABLE HOUSING
[Amended 9-12-2022] | ||
1.
|
Fee in lieu, per affordable housing unit required
|
$100,000
|